This is a legally mandated program outlined in Section 8 of the ASME A17.1 code. It stipulates some basic general requirements for elevator maintenance and record keeping. An MCP diary is required to be kept onsite and accessible to elevator personnel. It should include all information necessary to maintain, service, and repair your elevator equipment.